What Is The Secret To A Successful Sign Program?

As a leading sign company, National Sign Team (NST) understands that every sign project is unique and requires careful planning and execution. To ensure a successful outcome, we follow a typical project life cycle that involves collaboration with the client, code checks, site surveys, design, fabrication, installation, and finalization. Here's an overview of the process:



Initial Stage: Information Gathering


The first step in any sign project is to gather the necessary information from the client. This typically includes the site address, site plan, building elevations, and landlord contact. NST also conducts a code check to ensure the project complies with local laws and regulations.



Design Stage: Conceptualization


After gathering the necessary information, NST reviews the client's criteria and surveys the site. From there, we begin to brand the site and design the sign, taking into account the client's preferences and the local laws and regulations. This stage typically takes around five days, after which we present the conceptual drawings to the client for approval.



Revision Stage: Refining the Design


Once the client has reviewed the conceptual drawings, they may provide mark-ups and comments that need to be addressed. NST will make revisions as necessary until the client approves the final design.



Pricing Stage: Estimation of Project Cost


Once the design has been finalized, NST will provide the client with a price estimate for the project, which typically takes 3-5 days to prepare.



Permitting and Approval Stage: Ensuring Compliance


Before fabrication can begin, NST will apply for permits and engineering approvals. We also submit the design for landlord approval, which typically takes around five days. Once all necessary approvals are obtained, we can move on to the fabrication stage.



Fabrication Stage: Bringing the Design to Life


The fabrication stage typically takes 4-6 weeks to complete, depending on the complexity of the design. NST has state-of-the-art equipment and experienced fabricators who can create signs of any size and design.



Installation Stage: Putting the Sign in Place


Once the sign has been fabricated, it is shipped to the site, which takes approximately five days. NST's experienced installers will then put the sign in place, ensuring that it is securely and safely installed.



Finalization Stage: Completion and Photographs


Once the sign is installed, NST obtains the necessary permits and conducts final inspections to ensure compliance with local laws and regulations. We then take photographs of the completed project to document its success.



Sign Project Takeaways


A sign project involves many steps, including information gathering, design, revision, pricing, permitting and approval, fabrication, installation, and finalization. By following a typical project life cycle, NST can ensure that every project is completed on time, on budget, and to the client's satisfaction.


Ready to get started on your sign project? Contact us today to schedule a consultation and learn more about our expert sign design, fabrication, and installation services. Our team is here to help you achieve the perfect sign for your business. Give us a call at 727.859.1044 or visit our Contact Page to schedule your consultation now!

LOOKING FOR SOME MORE INFO ABOUT SIMPLIFIED SIGN PROJECT MANAGEMENT?

Complete the form and download our Simplified PM Infograph.

Infographic request

By Brandon Morelli March 27, 2025
Discover why neon channel letters and faux neon signs are ideal for commercial storefronts and restaurants. Learn when and how to choose neon signage.
A collage of various signs including one for walmart
By Dan Morelli March 12, 2025
Rebranding your storefront? Learn the latest signage & branding trends, from minimalist nostalgia to modern updates, for lasting impact.
A national sign team logo on a blue background
By Brandon Morelli March 6, 2025
Discover the top 7 storefront sign types big franchises use to attract customers. Learn how to choose, match, and rebrand your signage for success.
A man is sitting at a desk with a laptop and a sticky note on it that says `` delayed again ''.
By Brandon Morelli February 27, 2025
Discover whether managing your signs in-house or outsourcing to a national sign company is the right move for your growing brand.
A construction worker wearing a hard hat and safety vest is looking at a clipboard.
By Brandon Morelli February 20, 2025
A signage site survey ensures compliance, visibility, and proper placement. Learn why it’s crucial and how to prepare for a smooth installation.
Collage of storefront signs of popular brands like Planet Holywood.
By Mike Morelli February 13, 2025
Franchisors need more than just signs. National Sign Team provides real-time project management and execution for franchise signage nationwide.
A building with a sign that says alloy on it
By Brandon Morelli February 5, 2025
National Sign Team ensures brand consistency with precise color-matched signage for Alloy Personal Training in Bonney Lake, WA. See the results.
A row of brick houses on a narrow street
By Dan Morelli January 30, 2025
Learn how to maintain brand consistency while complying with historic district regulations. Tips for signage, lighting, and permits included.
A large building with a lot of windows is lit up at night.
By Brandon Morelli January 15, 2025
Discover how National Sign Team used Face-Lit LED Illuminated Channel Letters to elevate Sono Bello Albuquerque’s branding. Learn more today!
A sign for planet hollywood is lit up at night
By Mike Morelli January 9, 2025
Explore how National Sign Team tackled the challenges of big-city signage with Planet Hollywood in Times Square, blending bold design with brand impact.
More Posts
Share by: